Violation Detail
Standard Cited: 19261203 E02 V B
Inspection Nr: 1299718.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,467.00
Current Penalty: $4,000.00
Issuance Date: 06/06/2018
Nr Instances: 2
Nr Exposed: 6
Abatement Date: 08/10/2018
Gravity:
Report ID: 0627500
Contest Date:
Final Order: 07/02/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/02/2018 | $4,000.00 | 08/10/2018 | Other | |
Penalty | Z: Issued | 06/06/2018 | $6,467.00 | 06/12/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.1203(e)(2)(v)(B): The forced air ventilation must be so directed as to ventilate the immediate areas where an employee is or will be present within the space and must continue until all employees have left the space; On or about February 21, 2018, the employer did not ensure that positive air ventilation was used for entrant(s) working in 22.5 ft. deep manholes. Employees were exposed health hazards.