Violation Detail
Standard Cited: 19100039 C03
Inspection Nr: 1299619.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,956.00
Current Penalty: $2,956.00
Issuance Date: 08/24/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/10/2018
Gravity: 5
Report ID: 0626000
Contest Date:
Final Order: 09/19/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 08/24/2018 | $2,956.00 | 10/10/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.39(c)(3): Procedures for regular maintenance of safeguards installed on heat-producing equipment to prevent the accidental ignition of combustible materials: At the Production Area, Heat Blower Bending Station, employees were exposed to a fire hazard, when the heating oven was supported on a combustible wood frame table.