Standard Cited: 19100119 F01 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 1295671.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $12,934.00
Current Penalty: $0.00
Issuance Date: 08/09/2018
Nr Instances: 1
Nr Exposed: 24
Abatement Date: 08/28/2018
Gravity: 10
Report ID: 0625700
Contest Date: 08/29/2018
Final Order: 01/28/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/28/2019 | $0.00 | 08/28/2018 | Serious | |
Penalty | C: Contested | 09/07/2018 | $12,934.00 | 08/28/2018 | Serious | |
Penalty | Z: Issued | 08/09/2018 | $12,934.00 | 08/28/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process. IN THE ALTERNATIVE 29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment. (a) On or about February 13, 2018 and at a time prior to, in the 320 Area of the CITGO Refinery in Lake Charles, LA the employer did not implement written procedures to guide the operators while performing tasks that involve assembly of critical bolted flanges in process piping.