Violation Detail
Standard Cited: 19260451 F07 General requirements.
Inspection Nr: 1287806.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,880.00
Current Penalty: $3,200.00
Issuance Date: 04/05/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/01/2018
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 05/01/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/01/2018 | $3,200.00 | 05/01/2018 | Serious | |
| Penalty | Z: Issued | 04/05/2018 | $3,880.00 | 05/01/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: (a) On or about January 10, 2018, at the front of a two-story commercial building, employees erecting a tubular welded frame scaffold near an overhead power line without a competent person were exposed to an electrical hazard.
Translate