Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1284257.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 05/18/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0317500
Contest Date: 06/13/2018
Final Order: 07/05/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 07/05/2019 | $12,934.00 | Serious | ||
Penalty | C: Contested | 06/13/2018 | $12,934.00 | Serious | ||
Penalty | Z: Issued | 05/18/2018 | $12,934.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) Jobsite, 460 South Mount Vernon Avenue Extension, Uniontown, PA 15401: On or about December 19, 2017, an employee was permitted to work in close proximity to overhead power lines while attempting to remove a roof anchor from an overhead 12,000 volt power line.