Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1280860.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,641.00
Current Penalty: $5,820.50
Issuance Date: 05/10/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 06/01/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/01/2018 | $5,820.50 | Serious | ||
Penalty | Z: Issued | 05/10/2018 | $11,641.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.416(a)(1): Employee(s) were permitted to work in proximity to electric power circuits that were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a. On or about November 28, 2017, while installing a buss duct, employees were working on electrical circuits that had not been de-energized, exposing employees to the hazard of arc flash.