Violation Detail
Standard Cited: 19100303 B07 IV General.
Inspection Nr: 1275039.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,163.00
Current Penalty: $7,500.00
Issuance Date: 04/16/2018
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 04/25/2018
Gravity: 5
Report ID: 0524700
Contest Date: 05/11/2018
Final Order: 10/11/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 10/11/2018 | $7,500.00 | 04/25/2018 | Serious | |
Penalty | C: Contested | 05/16/2018 | $10,163.00 | 04/25/2018 | Serious | |
Penalty | Z: Issued | 04/16/2018 | $10,163.00 | 04/25/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.303(b)(7)(iv): There were damaged parts that adversely affected safe operation or mechanical strength of the equipment, such as parts that were broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating. a. Wilbert, Inc. located in Bellevue, Ohio: On or about November 1, 2017, the employer did not ensure the main electrical disconnect for plastic injection molding press A15 was in working order. The mechanical linkage that disconnects the electrical power inside of the cabinet was missing which required employees to reach into the energized cabinet to disconnect the power.