Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1274399.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,467.00
Current Penalty: $6,467.00
Issuance Date: 04/13/2018
Nr Instances: 7
Nr Exposed: 50
Abatement Date: 04/25/2018
Gravity: 5
Report ID: 0214500
Contest Date: 05/01/2018
Final Order: 02/04/2019
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/04/2019 | $6,467.00 | 04/25/2018 | Serious | |
Penalty | C: Contested | 05/01/2018 | $6,467.00 | 04/25/2018 | Serious | |
Penalty | Z: Issued | 04/13/2018 | $6,467.00 | 04/25/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Stamping room: The Exit Door had two turn knob locks that were kept in the locked position during the 1st and 2nd shifts, on or about 10/27/2017. b) Paint Room Exit door: The Exit Door had two turn knob locks that were kept in the locked position during the 1st and 2nd shifts, on or about 10/27/2017.