Violation Detail
Standard Cited: 19100147 C07 III B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1273940.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $6,566.00
Issuance Date: 04/03/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 05/13/2019
Gravity:
Report ID: 0418300
Contest Date: 04/19/2018
Final Order: 03/11/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 03/11/2019 | $6,566.00 | 05/13/2019 | Other | |
| Penalty | C: Contested | 04/25/2018 | $12,934.00 | 04/13/2018 | Serious | |
| Penalty | Z: Issued | 04/03/2018 | $12,934.00 | 04/13/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(7)(iii)(B): Additional retraining shall also be conducted whenever a periodic inspection under paragraph (c)(6) of this section reveals, or whenever the employer has reason to believe that there are deviations from or inadequacies in the employee's knowledge or use of the energy control procedures: (a) On or about October 29, 2017 - Rehang Area, employees who clean, service, and maintain the Meyn Automatic Rehang Machines between the Kill Line and Evisceration Lines 1 and 2 had not received training on where to apply the three locks on the electrical breakers in order to ensure energy isolation.
Translate