Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1245573.015
Citation: 01002
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $7,696.00
Current Penalty: $3,848.00
Issuance Date: 12/14/2017
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 01/21/2019
Gravity:
Report ID: 0111400
Contest Date: 02/08/2018
Final Order: 03/04/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/04/2019 | $3,848.00 | 01/21/2019 | Other | |
Penalty | C: Contested | 03/07/2018 | $7,696.00 | Serious | ||
Penalty | Z: Issued | 12/14/2017 | $7,696.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.37(a)(3): Exit routes were not free and unobstructed. Materials or equipment were placed, either permanently or temporarily, within the exit route. Location: Rear exit, Shaker Tunnel The rear exit route had materials and equipment which obstructed and impeded safe exit.