Standard Cited: 19260451 E09 IV General requirements.
Inspection Nr: 1244918.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,408.00
Current Penalty: $6,844.00
Issuance Date: 12/07/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/04/2018
Gravity: 10
Report ID: 0316300
Contest Date:
Final Order: 12/20/2017
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/20/2017 | $6,844.00 | 01/04/2018 | Serious | |
| Penalty | Z: Issued | 12/07/2017 | $11,408.00 | 01/04/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(e)(9)(iv): The use of cross braces on tubular welded frame scaffolds was not prohibited as a means of access or egress. (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461, Condition: Employee(s) were only able to climb on and through the cross braces on the tubular welded frame scaffold system in order to access and egress the extended work platform where they were standing while pumping grout in the block walls. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.