Violation Detail
Standard Cited: 19260602 C01 II Material handling equipment.
Inspection Nr: 1244825.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/23/2017
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 09/19/2017
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 09/25/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 08/23/2017 | $0.00 | 09/19/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.602(c)(1)(ii): No modifications or additions which affect the capacity or safe operation of the equipment shall be made without the manufacturer's written approval. If such modifications or changes are made, the capacity, operation, and maintenance instruction plates, tags, or decals shall be changed accordingly. In no case shall the original safety factor of the equipment be reduced. a) On or about July 5, 2017 and at times prior to, employees were engaged in installing standing seam metal roofing. The employees were lifted on to the roof with a basket attached to LULL D-34 equipment, exposing them to a fall hazard of about 20 ft. 6 inches to the concrete floor below. The basket was not manufacturer's approved attachment.