Violation Detail
Standard Cited: 19100036 B06 Design and construction requirements for exit routes.
This violation item has been deleted.
Inspection Nr: 124041682
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $1,275.00
Current Penalty:
Issuance Date: 01/23/1996
Nr Instances: 3
Nr Exposed: 72
Abatement Date: 02/10/1996
Gravity: 01
Report ID: 0551800
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/23/1996 | 02/10/1996 | Serious | ||
| Penalty | Z: Issued | 01/23/1996 | $1,275.00 | 02/10/1996 | Serious |
Translate