Violation Detail
Standard Cited: 19260453 B02 I Aerial lifts.
Inspection Nr: 1236145.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,675.00
Current Penalty: $12,000.00
Issuance Date: 11/07/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/28/2017
Gravity: 10
Report ID: 0215000
Contest Date: 12/06/2017
Final Order: 12/05/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/05/2018 | $12,000.00 | 11/28/2017 | Serious | |
Penalty | C: Contested | 12/06/2017 | $12,675.00 | 11/28/2017 | Serious | |
Penalty | Z: Issued | 11/07/2017 | $12,675.00 | 11/28/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.453(b)(2)(i): Lift controls shall be tested each day prior to use to determine that such controls are in safe working condition. a) Barge under new Mill Basin Bridge: Employees utilized an articulating boom aerial lift to install bolts on the bridge steel girders. Lift controls were not tested on the day of operation prior to use to determine that the controls were in safe working condition. On or about 05/26/17.