Violation Detail
Standard Cited: 19100269 M03 II Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1236022.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $12,675.00
Current Penalty: $0.00
Issuance Date: 09/28/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/30/2017
Gravity: 10
Report ID: 0213600
Contest Date: 10/17/2017
Final Order: 02/26/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 02/26/2018 | $0.00 | 10/30/2017 | Serious | |
| Penalty | C: Contested | 10/20/2017 | $12,675.00 | 10/30/2017 | Serious | |
| Penalty | Z: Issued | 09/28/2017 | $12,675.00 | 10/30/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(m)(3)(ii): The employer did not ensure that all switches, disconnectors, jumpers, taps, and other means through which known sources of electric energy may be supplied to the particular lines and equipment to be denenergized were open. a) On or about 05/30/18 at Substation #7, Beach Avenue, Rochester, NY, as part of the switching orders for the inspection and testing of the circuit breaker for capacitors 1R7402 and 1R7412, (an atypical configuration for this type of equipment within the system), employer did not include the isolation and the denergizing of the known source of electrical energy, Line 555 which supplied power to the circuit breaker disconnects. ABATEMENT DOCUMENTATION REQUIRED