Violation Detail
Standard Cited: 19260651 K01 Specific Excavation Requirements.
Inspection Nr: 1221111.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $8,873.00
Current Penalty: $4,500.00
Issuance Date: 04/25/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0112600
Contest Date: 04/18/2017
Final Order: 06/22/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/22/2018 | $4,500.00 | Serious | ||
Penalty | C: Contested | 06/13/2017 | $8,873.00 | Serious | ||
Penalty | Z: Issued | 04/25/2017 | $8,873.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.651(k)(1): An inspection of the excavations, the adjacent areas, and protective systems was not made after every rainstorm or other hazard increasing occurrence: 33 Allen Road Holden, MA: On or about March 29, 2017 the inspection conducted by the competent person had not identified the hazards associated with active water intrusion along the face of the excavation which increased the likelihood of a trench wall collapse exposing employees to engulfment hazards. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).