Violation Detail
Standard Cited: 19100176 A Handling materials - general.
Inspection Nr: 1220560.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/02/2017 2
Initial Penalty: $12,675.00
Current Penalty: $7,605.00
Issuance Date: 08/17/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 10
Report ID: 0317900
Contest Date:
Final Order: 09/06/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/06/2017 | $7,605.00 | 10/02/2017 | Serious | |
Penalty | Z: Issued | 08/17/2017 | $12,675.00 | 08/29/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.176(a): Where mechanical handling equipment was used, sufficient safe clearances were not allowed for aisles, at loading docks, through doorways or wherever turns or passage had to be made: a) Wells Fargo Bank Vault, Cheltenham Mall - On or about March 27, 2017, the employer did not ensure that there was sufficient clearance in the aisle between safe deposit box units to safely utilize the material handling equipment provided for the task of moving the safe deposit boxes. Abatement Note: Among other feasible means of abatement, the employer should conduct a pre-operational meeting based on a Job Hazard Analysis to ensure each worker are aware of their specific responsibilities and worksite related factors to materially reduce the hazards related to the removal of heavy objects for restrictively spaced locations.