Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1214790.015
Citation: 01002
Citation Type: Serious
Abatement Date: 06/19/2017 2
Initial Penalty: $4,889.00
Current Penalty: $2,933.40
Issuance Date: 05/02/2017
Nr Instances: 2
Nr Exposed: 107
Related Event Code (REC): C
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 05/25/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/25/2017 | $2,933.40 | 06/19/2017 | Serious | |
Penalty | Z: Issued | 05/02/2017 | $4,889.00 | 06/19/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: On, or about, March 3, 2017, in the following locations, the purpose of branch circuits had not been provided on the following electrical equipment: A. Main Floor: A General Electric Flex-a-Plug that supplied power to the Wave Wash room. B. Main Electrical Room: An ITE 120/208 volt panelboard that contained five circuits in the on position.