Violation Detail
Standard Cited: 19100036 B05 Design and construction requirements for exit routes.
Inspection Nr: 119522738
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,700.00
Current Penalty: $1,890.00
Issuance Date: 02/01/1995
Nr Instances: 1
Nr Exposed: 50
Abatement Date: 02/06/1995
Gravity: 02
Report ID: 0352450
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/03/1995 | $1,890.00 | 02/06/1995 | Serious | |
| Penalty | Z: Issued | 02/01/1995 | $2,700.00 | 02/06/1995 | Serious |
Translate