Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1189898.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,338.00
Current Penalty: $3,169.00
Issuance Date: 05/01/2017
Nr Instances: 2
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0216000
Contest Date: 05/24/2017
Final Order: 08/20/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/20/2018 | $3,169.00 | Serious | ||
Penalty | C: Contested | 05/30/2017 | $6,338.00 | Serious | ||
Penalty | Z: Issued | 05/01/2017 | $6,338.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.219(c)(2)(i): All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting: location: production room A on or about: 3/28/17 a) The 777 flavor coffee grinder was not provided with guarding to prevent employees from coming into contact with the rotating shaft driving the shaker tray. location: production room A on or about: 3/28/17 b) The 888 coffee grinder was not provided with guarding to prevent employees from coming into contact with the rotating shaft driving the shaker tray. NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.