Violation Detail
Standard Cited: 19100107 B09 Spray finishing using flammable and combustible materials.
Inspection Nr: 1188746.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Solicitor Advised
Initial Penalty: $2,897.00
Current Penalty: $2,897.00
Issuance Date: 05/02/2017
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 05/26/2017
Gravity: 5
Report ID: 0213400
Contest Date:
Final Order: 05/25/2017
Related Event Code (REC): R
Emphasis:
Failure to Abate | |||||||
---|---|---|---|---|---|---|---|
Activity Nr | Issuance | Penalty | Contest | Final Order | |||
1248204 | 02/13/2018 | $29,564.00 | 03/13/2018 |
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
FTA | Z: Issued | 02/13/2018 | $29,564.00 | 03/05/2018 | 1248204.015 | |
Penalty | Z: Issued | 05/02/2017 | $2,897.00 | 05/26/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.107(b)(9): A clear space of not less than 3 feet on all sides was not kept free from storage or combustible construction: a) Metropolitan Woodwork 5 Cornell Parkway, Union, NJ site - Paint Room: The lateral walls of the paint spray booth were covered with a work bench and a storage cabinet containing stored chemicals including but not limited to lacquer thinner, various paints and stains. Condition noted on or about 11/3/2017.