Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1183441.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,157.00
Current Penalty: $3,694.20
Issuance Date: 04/06/2017
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 05/02/2017
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 04/19/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/19/2017 | $3,694.20 | 05/02/2017 | Serious | |
| Penalty | Z: Issued | 04/06/2017 | $6,157.00 | 05/02/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about 10/12/2016 - Production area, injection molding machine, Milicron, Model SF1000MWP-2X830, S/N N5700AA020003, 7049 Greenbrier Parkway NW, Madison, AL, the employer did not develop or utilize Lockout/Tag out procedures when employees were removing the nozzle of the injection molding machine, to ensure the pressure relief valve did not have stored energy.