Violation Detail
Standard Cited: 19100333 B02 I Selection and use of work practices
Inspection Nr: 1177124.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,224.00
Current Penalty: $9,540.40
Issuance Date: 11/28/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 08/12/2017
Gravity: 10
Report ID: 0728500
Contest Date: 12/21/2016
Final Order: 05/12/2017
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/12/2017 | $9,540.40 | 08/12/2017 | Serious | |
Penalty | C: Contested | 02/15/2017 | $11,224.00 | 12/22/2016 | Serious | |
Penalty | Z: Issued | 11/28/2016 | $11,224.00 | 12/22/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.333(b)(2)(i): The employer did not make a written copy of the procedures outlined in paragraph (b)(2) of 29 CFR 1910.333 available for inspection by employees and by the Assistant Secretary of Labor and his or her authorized representatives: (a) On and before September 2, 2016, the employer had not developed written Lock Out Tag Out procedures for employees engaged in maintenance work tasks involving an Energized 480 Volt Electrical Panel, located in the Electrical Vault of the Mill Basemen. As a result, an Arc Flash occurred seriously injuring the employee. Abatement certification is required for this item; use the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET for this purpose.