Violation Detail
Standard Cited: 19100110 E04 III Storage and handling of liquefied petroleum gases.
Inspection Nr: 1173119.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $4,276.00
Current Penalty: $2,565.60
Issuance Date: 10/07/2016
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 10/20/2016
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 10/27/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/27/2016 | $2,565.60 | 10/20/2016 | Serious | |
Penalty | Z: Issued | 10/07/2016 | $4,276.00 | 10/20/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.110(e)(4)(iii): Permanent and removable fuel containers were not securely mounted to prevent jarring loose, slipping, or rotating: (a) Facility Wide - On August 26, 2016, the employer did not ensure that an LP gas container was securely mounted to prevent jarring loose, slipping or rotating on the Toyota #2 sit down forklift. In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.