Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1170128.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,975.00
Current Penalty: $5,078.00
Issuance Date: 02/08/2017
Nr Instances: 3
Nr Exposed: 8
Abatement Date: 02/28/2017
Gravity: 1
Report ID: 0626600
Contest Date:
Final Order: 02/28/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/28/2017 | $5,078.00 | 02/28/2017 | Serious | |
Penalty | Z: Issued | 02/08/2017 | $5,975.00 | 02/28/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process. On or about August 9th 2016 in the Multi-Purpose Unit at Arkema, Inc. located in Crosby, TX, the employer did not ensure piping and instrument diagrams were accurate and presented equipment that was existing and was part of the process, such as but not limited to the following piping and instrument diagrams: a) P&ID CR-30-X0200 b) P&ID CR-30-X0209 c) P&ID CR-30-X0210