Violation Detail
Standard Cited: 19100036 B06 Design and construction requirements for exit routes.
This violation item has been deleted.
Inspection Nr: 116516535
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $1,700.00
Current Penalty: $1,700.00
Issuance Date: 02/11/1997
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 03/03/1997
Gravity: 02
Report ID: 0316400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/10/1997 | $1,700.00 | 03/03/1997 | Serious | |
| Penalty | Z: Issued | 02/11/1997 | $1,700.00 | 03/03/1997 | Serious |
Translate