Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1162741.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,471.00
Current Penalty: $7,482.60
Issuance Date: 11/30/2016
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 05/01/2017
Gravity: 10
Report ID: 0316400
Contest Date: 12/23/2016
Final Order: 04/12/2017
Related Event Code (REC): A
Emphasis:
Substance: 1640
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/12/2017 | $7,482.60 | 05/01/2017 | Serious | |
| Penalty | C: Contested | 12/27/2016 | $12,471.00 | 12/12/2016 | Serious | |
| Penalty | Z: Issued | 11/30/2016 | $12,471.00 | 12/12/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii): The employer's written energy control procedures did not specifically outline the scope, purpose, authorization, rules, and techniques to be utilized when the control of hazardous energy may be necessary for leak repair: a) Harmony Road, Gandeeville, WV: On or about July 17, 2016 and times prior, the employer's written energy control procedures did not specifically outline the scope, purpose, authorization, rules and techniques to be utilized when the control of hazardous energy may be necessary and feasible to assure employee safety when repairing leaking natural gas gathering lines.
Translate