Violation Detail
Standard Cited: 19100255 B05 Resistance welding.
Inspection Nr: 1156866.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,799.00
Current Penalty: $9,799.00
Issuance Date: 12/12/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/22/2016
Gravity: 5
Report ID: 0418600
Contest Date: 01/05/2017
Final Order: 03/23/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 03/23/2023 | $9,799.00 | 12/22/2016 | Serious | |
| Penalty | C: Contested | 01/17/2017 | $9,799.00 | 12/22/2016 | Serious | |
| Penalty | Z: Issued | 12/12/2016 | $9,799.00 | 12/22/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.255(b)(5): The hazard of flying sparks was not, wherever practical, eliminated by installing a shield guard of safety glass or suitable fire resistant plastic at the point of operation to protect the operator or passing persons: a) ADA Projection Welders; On or about June 23, 2016 and at times prior thereto, the employer exposed employees to burn hazards in that the employer did not install effective shields or curtains on projection press welding machines #PW 33 and #PW 33-1 to protect the operator or other employees working in close proximity from flying sparks.