Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 115682007
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $500.00
Current Penalty:
Issuance Date: 04/10/1992
Nr Instances: 2
Nr Exposed: 9
Abatement Date: 04/15/1992
Gravity: 10
Report ID: 0454510
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/21/1992 | 04/15/1992 | Serious | ||
| Penalty | Z: Issued | 04/10/1992 | $500.00 | 04/15/1992 | Serious |
Translate