Violation Detail
Standard Cited: 19100036 B08 Design and construction requirements for exit routes.
This violation item has been deleted.
Inspection Nr: 115074163
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $825.00
Current Penalty: $825.00
Issuance Date: 08/02/1995
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 08/14/1995
Gravity: 01
Report ID: 0751910
Contest Date: 08/17/1995
Final Order: 03/27/1996
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/27/1996 | $825.00 | 08/14/1995 | Serious | |
| Penalty | Z: Issued | 08/02/1995 | $825.00 | 08/14/1995 | Serious |
Translate