Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1140335.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $26,725.00
Current Penalty: $12,471.00
Issuance Date: 09/28/2016
Nr Instances: 1
Nr Exposed: 21
Abatement Date: 10/25/2016
Gravity: 1
Report ID: 0316300
Contest Date:
Final Order: 10/24/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2016 | $12,471.00 | 10/25/2016 | Serious | |
Penalty | Z: Issued | 09/28/2016 | $26,725.00 | 10/25/2016 | Repeat |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: a) 44715 Prentice Dr., Sterling, VA 20166: On or about April 15, 2016, and times prior thereto, the electrical pull box with 120 volt wiring on the Marathon Equipment Company baler did not have a cover, exposing employees to electrical shock. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.