Violation Detail
Standard Cited: 19260651 K01 Specific Excavation Requirements.
Inspection Nr: 113919625
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,500.00
Current Penalty: $167.00
Issuance Date: 09/30/1991
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 10/03/1991
Gravity: 10
Report ID: 0214700
Contest Date: 10/22/1991
Final Order: 09/28/1992
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 09/28/1992 | $167.00 | 10/03/1991 | Serious | |
| Penalty | Z: Issued | 09/30/1991 | $1,500.00 | 10/03/1991 | Serious |
Translate