Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1133173.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,988.00
Current Penalty: $4,988.00
Issuance Date: 09/15/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/12/2016
Gravity: 10
Report ID: 0213400
Contest Date:
Final Order: 10/11/2016
Related Event Code (REC): C
Emphasis:
Substance: B104
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/15/2016 | $4,988.00 | 10/12/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauges, audible alarms or pressure activated devices installed in paint spray booths to indicate or ensure that the required air speed was maintained: a) Exigo Metal Works/Hillside, NJ - Production Area/Spray booth: Employer did not ensure that the spray booth was provided with a working manometer. Condition observed on or about March 17, 2016.