Violation Detail
Standard Cited: 19260850 B Preparatory operations.
This violation item has been deleted.
Inspection Nr: 1115587.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/06/2016
Initial Penalty: $4,900.00
Current Penalty: $0.00
Issuance Date: 03/22/2016
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0134000
Contest Date: 04/15/2016
Final Order: 07/18/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/18/2016 | $0.00 | 05/06/2016 | Serious | |
Penalty | C: Contested | 05/02/2016 | $4,900.00 | 05/06/2016 | Serious | |
Penalty | Z: Issued | 03/22/2016 | $4,900.00 | 05/06/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(b): The walls or floors were not shored or braced where employee(s) were required to work within a damaged structure to be demolished: Location: 490 Arsenal Street, Watertown, MA between column line 8&10 and L&N Linx building main structure On or about 12/2/15, the employer failed to brace or shore the interior non-load bearing wall after the lower section of the wall was demolished. Later an employee performed demolition to the upper section of this wall and was struck in the back by a section of sheet rock.