Violation Detail
Standard Cited: 19260850 C Preparatory operations.
Inspection Nr: 1110029.015
Citation: 01002
Citation Type: Other
Abatement Date: 04/03/2016 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 03/01/2016
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC): A
Gravity:
Report ID: 0522500
Contest Date: 03/28/2016
Final Order: 12/19/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/19/2016 | $7,000.00 | 04/03/2016 | Other | |
Penalty | C: Contested | 04/04/2016 | $7,000.00 | 04/03/2016 | Serious | |
Penalty | Z: Issued | 03/01/2016 | $7,000.00 | 04/03/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(c): All electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside the building line before demolition work is started. In each case, any utility company which is involved shall be notified in advance. a) On or about December 2, 2015, one employee was fatally injured and a second employee was hospitalized when the towers supporting a cable coal bridge prematurely collapsed during their demolition. A pole mounted transformer and electrical power line located within the park side tower's fall zone had not been de-energized as required.