Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1109295.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,400.00
Current Penalty: $600.00
Issuance Date: 02/16/2016
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 03/02/2016
Gravity: 5
Report ID: 0627100
Contest Date:
Final Order: 03/16/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/16/2016 | $600.00 | 03/02/2016 | Serious | |
Penalty | Z: Issued | 02/16/2016 | $2,400.00 | 03/02/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: The exit at the back of the shop along the South wall was not free and unobstructed, with debris along the floor, exposing employees to tripping hazards in the event of an emergency.