Violation Detail
Standard Cited: 19100261 B01 Pulp, paper, and paperboard mills.
Inspection Nr: 1102511.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 04/21/2016
Nr Instances: 3
Nr Exposed: 20
Abatement Date: 03/08/2017
Gravity: 10
Report ID: 0523900
Contest Date: 05/13/2016
Final Order: 02/06/2017
Related Event Code (REC): A;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 02/06/2017 | $7,000.00 | 03/08/2017 | Serious | |
Penalty | C: Contested | 05/17/2016 | $7,000.00 | 05/12/2016 | Serious | |
Penalty | Z: Issued | 04/21/2016 | $7,000.00 | 05/12/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.261(b)(1): The employer did not ensure that the main power disconnect switch or valve, or both, controlling its source of power or flow of material, was locked out or blocked off with padlock, blank flange, or similar device before conducting any maintenance, inspection, cleaning, adjusting, or servicing of equipment (electrical, mechanical, or other) that required entrance into or close contact with the machinery or equipment: (a) In the facility; During the time period from October 23, 2015 through October 27, 2015 equipment was not deenergized and locked out prior to performing cleaning, clearing jams and servicing on equipment including, but not limited to the following: i. cleaning and clearing jams on the wet lap machine; ii. servicing, cleaning and clearing jams on the forward cleaners; and iii. servicing and clearing jams on the course screen in the deinking process.