Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 109845958
Citation: 01002
Citation Type: Serious
Abatement Status: I
Initial Penalty: $2,000.00
Current Penalty: $1,000.00
Issuance Date: 06/26/2000
Nr Instances: 3
Nr Exposed: 7
Abatement Date: 06/29/2000
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/18/2000 | $1,000.00 | 06/29/2000 | Serious | |
| Penalty | Z: Issued | 06/26/2000 | $2,000.00 | 06/29/2000 | Serious |
Translate