Violation Detail
Standard Cited: 19100036 B06 Design and construction requirements for exit routes.
Inspection Nr: 109114256
Citation: 01002
Citation Type: Serious
Abatement Status: A
Initial Penalty: $750.00
Current Penalty: $750.00
Issuance Date: 01/31/1992
Nr Instances: 2
Nr Exposed: 12
Abatement Date: 02/07/1992
Gravity: 03
Report ID: 0215600
Contest Date:
Final Order:
Related Event Code (REC): R
Emphasis: