Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1090583.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Employer Out of Business
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 12/09/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/01/2016
Gravity: 5
Report ID: 0111400
Contest Date:
Final Order: 01/07/2016
Related Event Code (REC): C
Emphasis:
Failure to Abate | |||||||
---|---|---|---|---|---|---|---|
Activity Nr | Issuance | Penalty | Contest | Final Order | |||
1134703 | 07/18/2016 | $10,000.00 | 08/11/2016 |
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
FTA | Z: Issued | 07/18/2016 | $10,000.00 | 08/24/2016 | 1134703.015 | |
Penalty | Z: Issued | 12/09/2015 | $2,000.00 | 02/01/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.107(b)(5)(i): Spraying operation were not designed, installed, and maintained that the average face velocity over the open face of the booth was not less than 100 linear feet per minute. Visible gauges, audible alarms, or pressure activated devices were not installed to indicate or insure that the required air velocity was maintained. Location: Paint booth 1) The average face velocity over the open face of the booth averaged approximately 10-15 linear feet per minute. 2) There were no visible gauges or audible alarms on the spray booth to indicate that the face velocity was at least 100 feet per minute