Violation Detail
Standard Cited: 19260651 B04 Specific Excavation Requirements.
Inspection Nr: 1081576.015
Citation: 01002
Citation Type: Serious
Abatement Date: 03/07/2016 2
Initial Penalty: $7,000.00
Current Penalty: $5,000.00
Issuance Date: 11/03/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0112600
Contest Date: 11/23/2015
Final Order: 03/21/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/21/2016 | $5,000.00 | 03/07/2016 | Serious | |
Penalty | C: Contested | 12/28/2015 | $7,000.00 | 11/16/2015 | Serious | |
Penalty | Z: Issued | 11/03/2015 | $7,000.00 | 11/16/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.651(b)(4): While the excavation is open, underground installations were not protected, supported or removed as necessary to safeguard employees: a) 148 Hazardville Rd., Longmeadow, MA: On or about July 31, 2015, a 6 inch water pipe in an open excavation was not protected to safeguard employees. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).