Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1081204.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,930.00
Current Penalty: $4,500.00
Issuance Date: 01/27/2016
Nr Instances: 2
Nr Exposed: 10
Abatement Date: 02/08/2016
Gravity: 10
Report ID: 0418600
Contest Date:
Final Order: 02/18/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/18/2016 | $4,500.00 | 02/08/2016 | Serious | |
Penalty | Z: Issued | 01/27/2016 | $6,930.00 | 02/08/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedure did not clearly and specifically procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: a) Robot cell (UMA Line); On or about July 29, 2015 and at times prior; the employer exposed employees to hazardous energies (including electrical, pneumatic), caught-in and amputations hazards in that the machine specific lockout/tagout procedure did not adequately outline the procedural steps for shutting down, isolating, blocking and securing machines or equipment to control all energy sources when employees perform service or maintenance inside the Robot cell at the UMA Line. b) Robot cell (ANA Line); On or about July 29, 2015 and at times prior; the employer exposed employees to hazardous energies (including electrical, pneumatic), caught-in and amputations hazards in that the machine specific lockout/tagout procedure did not adequately outline the procedural steps for shutting down, isolating, blocking and securing machines or equipment to control all energy sources when employees perform service or maintenance inside the Robot cell at the ANA Line.