Violation Detail
Standard Cited: 19100036 B01 Design and construction requirements for exit routes.
Inspection Nr: 107562308
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $750.00
Current Penalty: $750.00
Issuance Date: 09/30/1992
Nr Instances: 4
Nr Exposed: 10
Abatement Date: 10/02/1992
Gravity: 10
Report ID: 0626700
Contest Date: 10/26/1992
Final Order: 04/25/1994
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/25/1994 | $750.00 | 10/02/1992 | Serious | |
| Penalty | Z: Issued | 09/30/1992 | $750.00 | 10/02/1992 | Serious |
Translate