Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1074140.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,620.00
Current Penalty: $4,620.00
Issuance Date: 12/16/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 01/13/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 12/16/2015 | $4,620.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(f)(6): The clearance between scaffolds and 240-volt uninsulated power lines was not a minimum of 10 feet when scaffolds were erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines: (a) Jobsite - The roof bracket scaffolding was erected approximately 1 foot from the live 240 Volt Power line.