Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 106940299
Citation: 01002
Citation Type: Serious
Abatement Status: I
Initial Penalty: $1,600.00
Current Penalty: $1,040.00
Issuance Date: 08/01/1996
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 08/06/1996
Gravity: 02
Report ID: 0213600
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/26/1996 | $1,040.00 | 08/06/1996 | Serious | |
| Penalty | Z: Issued | 08/01/1996 | $1,600.00 | 08/06/1996 | Serious |
Translate