Violation Detail
Standard Cited: 19260302 B01 Power-operated hand tools.
Inspection Nr: 1068239.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,390.00
Current Penalty: $3,230.00
Issuance Date: 11/30/2015
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/08/2015
Gravity: 10
Report ID: 0523300
Contest Date: 12/21/2015
Final Order: 04/09/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/09/2018 | $3,230.00 | 12/08/2015 | Serious | |
Penalty | C: Contested | 01/04/2016 | $5,390.00 | 12/08/2015 | Serious | |
Penalty | Z: Issued | 11/30/2015 | $5,390.00 | 12/08/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.302(b)(1): Pneumatic power tool(s) were not secured to the hose or whip by some positive means to prevent the tool from becoming accidentally disconnected: On or about June 2, 2015, pneumatic power tools were used in the bowl section of the water tower and were not secured to the hose or whipped by some positive means to prevent the tool from becoming accidentally disconnected. ABATEMENT DOCUMENTATION IS REQUIRED FOR THIS ITEM IN ACCORDANCE WITH REQUIREMENTS OF 29 CFR 1903.19(d).