Violation Detail

Standard Cited: 19260405 G02 IV Wiring methods, components, and equipment for general use.

Inspection Nr: 1067218.015

Citation: 01002

Citation Type: Serious

Abatement Status: Not Completed - Worksite Changed

Initial Penalty: $1,020.00

Current Penalty: $1,020.00

Issuance Date: 06/22/2015

Nr Instances: 1

Nr Exposed: 3

Abatement Date: 06/30/2015

Gravity: 1

Report ID: 0936200

Contest Date:

Final Order: 07/17/2015

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty Z: Issued 06/22/2015 $1,020.00 06/30/2015 Serious  

Text For Citation: 01 Item/Group: 002 Hazard:

29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief was provided which will prevent pull from being directly transmitted to joints or terminal screws: At the project, the outside insulation was pulled back from the receptacle on a flexible cord from a 3500 watt All Power generator to a 110 VAC Milwaukee cut off saw used to cut all thread. The all thread was used to hold down rebar from displacement during pouring of concrete. Employees were exposed to the hazards of contacting electricity.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.