Violation Detail
Standard Cited: 19100147 C06 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1060473.015
Citation: 01002
Citation Type: Serious
Abatement Date: 07/10/2015 2
Initial Penalty: $6,300.00
Current Penalty: $4,410.00
Issuance Date: 05/20/2015
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order: 06/16/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/16/2015 | $4,410.00 | 07/10/2015 | Serious | |
Penalty | Z: Issued | 05/20/2015 | $6,300.00 | 07/10/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(B): The periodic inspection of the energy control procedure was not conducted to correct any deviations or inadequacies identified: Worksite: The employer did not did not inspect lockout tagout procedures to identify inadequacies.