Violation Detail
Standard Cited: 19260652 C02 III Requirements for protective systems.
Inspection Nr: 1053481.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $2,000.00
Current Penalty: $1,400.00
Issuance Date: 04/29/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/26/2015
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 05/12/2015
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/12/2015 | $1,400.00 | 05/26/2015 | Serious | |
Penalty | Z: Issued | 04/29/2015 | $2,000.00 | 05/26/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.652(c)(2)(iii): Manufacturer's specifications, recommendations, and limitations, and manufacturer's approval to deviate from the specifications, recommendations, and limitations were not in written form at the jobsite during construction of the protective system and thereafter until the protective system was no longer utilized: a) A-B Contracting, Inc. @ Newport Landing & Hawkins Road, Fenton, MO 63026: On and before April 10, 2015, creating and correcting employer did not ensure that tabulated data was available for the EPI V-Shoring and 4 feet x 8 feet Sheeting System that was used as a protective system for the excavation. The excavation measured between 5 feet in depth on the east wall and 7 feet in depth on the west wall. This condition exposed employees to struck-by hazards.