Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1044433.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,500.00
Current Penalty: $1,750.00
Issuance Date: 08/13/2015
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 08/24/2015
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 08/28/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/28/2015 | $1,750.00 | 08/24/2015 | Serious | |
Penalty | Z: Issued | 08/13/2015 | $3,500.00 | 08/24/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a. Tiffin Metal Products Co. located in Tiffin, Ohio: The employer did not conduct a annual inspection of the Company's energy control procedures.